Primary Local Driving Topic: US 59 at FM 1794 Construction
The source identifies active 2026 interchange construction at US 59 and FM 1794.
Students should expect:
- Lane closures
- Construction trucks
- Temporary pavement markings
- Changed turning movements
- New bridge or ramp geometry
- Reduced work-zone speeds

