Primary Moore County Driving Topic: U.S. 87 Is Being Widened West of Dumas
The strongest current Moore County driver education topic is the U.S. 87 widening project.
In March 2026, TxDOT reported that construction was set to begin on a $99 million U.S. 87 upgrade in Hartley and Moore counties.
The project will convert the existing highway into a four-lane divided roadway with center turn lanes from the U.S. 385 area toward FM 2589 near Dumas.
TxDOT expects completion by 2030. (txdot.gov)
This means current students are learning on a corridor undergoing a major design change.
Existing Road Conditions
Older portions of the corridor operate as a Super-2 or lower-capacity rural highway.
Students need to understand:
Passing lanes
Oncoming traffic
Lane endings
Rural intersections
Truck spacing
Future Divided Highway Conditions
As the project is completed, students will encounter:
Two lanes in each direction
A divided roadway
Center turn lanes in some areas
Additional capacity
Different turning movements
New pavement markings
Construction Conditions
During construction, expect:
Lane shifts
Reduced speeds
Construction trucks
Barriers
Uneven pavement
Temporary signs
Changed shoulder conditions
Current traffic control always takes priority over memory.

